Skip to content
Professional Estimating LLC

Envelope & Interiors

Waterproofing Estimating Services in New Zealand

Membrane and tanking quantities for wet areas, decks, basements and roofs, with upstands, outlets and junction details counted.

Get a QuoteView a SampleTypical turnaround: 1–3 business days

Waterproofing failures are expensive, and so is waterproofing done properly. The cost is less about flat area and more about the details: upstands, corners, outlets, penetrations, thresholds and junctions with other materials. That is where membranes fail, and where installers spend their time.

We measure waterproofing by location and system: wet-area membranes in showers and bathrooms, deck and balcony membranes, roof membranes, basement and retaining wall tanking, and planter boxes. Flat areas, upstands and turn-downs are measured separately, and every outlet, penetration and junction detail is counted.

This gives the waterproofing applicator a scope they can price accurately, and gives the builder a clear picture of what is included.

Scope

What we measure in a waterproofing takeoff

ItemUnitWhat it covers
Wet-area membranesm²Floors and walls in showers and wet areas.
Deck and balcony membranesm²Over habitable spaces and exposed decks.
Roof membranesm²Flat roofs and gutters.
Basement tankingm²Walls and slabs below ground.
Upstands and turn-downslmAt walls, thresholds and edges.
Outlets and penetrationsno.Drains, overflows and pipe penetrations.
Substratesm²Plywood, fibre cement or screeds under membranes.
Drainage layersm²Protection boards and drainage behind retaining walls.

Deliverables

What you receive

Waterproofing estimates count each detail type separately, so applicators can price details at their own rate rather than averaging into the area rate.

Itemised quantity sheetExcel + PDF
Marked-up plansColour-coded PDF
Material and labour scheduleExcel
Assumptions and exclusions listPDF

Who it is for

Built for the people who price the work

Builders
Get a waterproofing scope that matches the details on the drawings.
Subcontractors
Applicators can quote areas and details separately.
Developers
Understand the cost of balconies over living spaces in apartments.
Architects
See the cost effect of level-entry showers and flush thresholds.

Process

How a waterproofing estimate runs

  1. STEP 01

    Upload plans

    Upload plans, sections, waterproofing details and the specification.

  2. STEP 02

    Scope confirmation

    We confirm membrane systems, substrates and who is responsible for each junction.

  3. STEP 03

    Takeoff and review

    Areas, upstands and details are measured and checked against floor and deck areas.

  4. STEP 04

    Delivery

    You receive the waterproofing schedule, detail counts, PDF and marked-up plans.

New Zealand context

Standards and practice

Internal wet areas must meet Building Code clause E3 (Internal moisture). Membranes in New Zealand are commonly used with a BRANZ Appraisal or CodeMark certificate, and installation by an approved applicator may be required by the manufacturer. We measure the specified system and note any approved applicator requirements.

External decks and roofs fall under clause E2 (External moisture). Membrane decks over living spaces carry higher risk, so details such as falls, upstand heights and outlet sizes are important, and we measure them as drawn.

We measure and price to the drawings. Design compliance and building consent remain with your designer and building consent authority.

Cost drivers

What drives the cost of waterproofing work

  • 01

    Number of details

    Outlets, penetrations, thresholds and corners take far more time than flat areas. A small deck with many details can cost more than a large plain one.

  • 02

    System type

    Liquid-applied, sheet and torch-on membranes have different material and labour costs. The specified system controls the price.

  • 03

    Substrate preparation

    Membranes need sound, clean and correctly falling substrates. Creating falls with screeds adds material and time.

  • 04

    Approved applicator

    Some systems must be installed by approved applicators, which may limit the pool of contractors and affect price.

Where waterproofing estimates go wrong

Waterproofing is often priced on flat area only. Upstands, turn-downs, outlets and penetrations are where the time goes, and they can double the effective cost of a small deck or shower.

Substrate is the other common gap. Membranes need the right substrate with the right falls, and creating falls with screed or tapered sheets is a separate item that is easy to miss.

Sequencing is the last common problem. Membranes are often damaged by following trades, or installed before penetrations are finalised, which means patching and retesting. We note where protection boards or flood testing are specified, because both take time and materials that are easy to leave out of a price. Flood testing a shower or deck before tiling or decking, and protecting the membrane afterwards, are good practice and often specified. Warranty registration and producer statements may also be required by the membrane supplier.

FAQ

Waterproofing Estimating questions

Do you measure upstands separately?

Yes. Upstands and turn-downs are measured in lineal metres separately from flat areas.

Do you count outlets and penetrations?

Yes. Every outlet, overflow and penetration is counted.

Can you estimate basement tanking?

Yes, including walls, slabs, protection boards and drainage layers.

Do you include substrates?

Yes. Substrates under membranes are measured where they are part of the scope.

Can you estimate tiled showers?

Waterproofing is measured here; tiling is under finishes or flooring. We can combine them if you prefer.

Related services

  • Roofing Estimating

    True roof areas calculated by pitch, with sheet lengths, flashings, gutters, downpipes and underlay measured for ordering.

  • Flooring Estimating

    Floor finish quantities by room and material, with roll and plank layouts, trims, underlay and subfloor preparation.

  • Finishes Estimating

    The fit-out that clients notice: tiling, splashbacks, cabinetry, fixtures, accessories and fit-off, measured from the finishes schedule.

  • Excavation Estimating

    Detailed excavation quantities for footings, basements, trenches and pits, with backfill, disposal and support measured separately.

Get a quote

Send your plans for a waterproofing estimate

Upload your drawings and we will reply with a fixed fee and turnaround before any work starts. No obligation.

  • — PDF, DWG and ZIP accepted
  • — Fees in NZD, excluding GST
  • — Prefer email? Use the link in the footer

We reply with a fixed fee and turnaround before starting.

Get a QuoteEmail Us