Skip to content
Professional Estimating LLC

Structure & Site

Demolition Estimating Services in New Zealand

Demolition and strip-out quantities by material, with disposal volumes and hazardous material allowances shown separately.

Get a QuoteView a SampleTypical turnaround: 2–4 business days

Demolition is priced on what is being removed, how it comes apart and where it goes. A strip-out of plasterboard and carpet costs very differently to breaking out a reinforced concrete slab, and both are affected by access, recycling options and any hazardous materials found along the way.

We measure demolition and strip-out by element and material: roofing, cladding, framing, linings, floor coverings, concrete, masonry and services. Volumes and weights are estimated for disposal, and materials that can be recycled, such as steel, concrete and clean timber, are separated so you can price disposal accurately.

We estimate full demolitions, partial demolitions for alterations, commercial strip-outs and soft strips before refurbishment.

Scope

What we measure in a demolition takeoff

ItemUnitWhat it covers
Roof and cladding removalm²By material type.
Internal strip-outm²Linings, ceilings, partitions and floor coverings.
Structural demolitionm² / m³Timber frame, masonry and concrete elements.
Slab and foundation breakoutm² / m³Including reinforcing for recycling.
Services disconnectionitemAllowances for making safe and capping services.
Disposal and recyclingm³ / tVolumes by waste stream.
Asbestos allowancesm² / itemProvisional, based on the asbestos survey if provided.
Protection and making goodm² / lmFor partial demolitions next to retained areas.

Deliverables

What you receive

Demolition estimates include a waste stream summary that supports your site waste management plan and helps you compare disposal and recycling options.

Itemised quantity sheetExcel + PDF
Marked-up plansColour-coded PDF
Material and labour scheduleExcel
Assumptions and exclusions listPDF

Who it is for

Built for the people who price the work

Builders
Price the demolition of an existing house before a rebuild on the same site.
Subcontractors
Demolition contractors can quote from a measured schedule of materials and volumes.
Developers
Budget for clearing a site with several older buildings, including likely asbestos.
Architects
Understand the cost of retaining versus replacing parts of an existing building.

Process

How a demolition estimate runs

  1. STEP 01

    Upload plans

    Upload existing drawings, the demolition plan, photos and any asbestos survey.

  2. STEP 02

    Scope confirmation

    We confirm the extent of demolition, retained elements and how hazardous materials should be treated.

  3. STEP 03

    Takeoff and review

    Each element is measured, converted to disposal volumes and checked against the building's overall size.

  4. STEP 04

    Delivery

    You receive the quantity sheet, waste stream summary, PDF and marked-up demolition plans.

New Zealand context

Standards and practice

Buildings constructed or altered before 2000 may contain asbestos. Under the Health and Safety at Work (Asbestos) Regulations 2016, an asbestos survey is generally needed before demolition or refurbishment, and licensed removal is required for certain work. We price asbestos only from a survey or as a clearly labelled provisional allowance.

Demolition may also require a building consent or notification to the council, and some notifiable work must be reported to WorkSafe. These are your responsibility, but we flag where they are likely to apply.

We measure and price to the drawings. Design compliance and building consent remain with your designer and building consent authority.

Cost drivers

What drives the cost of demolition work

  • 01

    Hazardous materials

    Asbestos removal can be a large part of a demolition budget. A survey before pricing turns an uncertain allowance into a measured quantity.

  • 02

    Method and access

    Machine demolition on an open site is much faster than hand demolition next to a neighbour or inside a building that stays occupied.

  • 03

    Disposal and recycling

    Landfill charges, recycling options and the distance to tip all affect cost. Separating waste streams can lower disposal costs and help meet waste targets.

  • 04

    Retained elements

    Partial demolition needs protection, propping and careful separation from the parts being kept. These items are easy to overlook and we measure them separately.

Where demolition estimates go wrong

The biggest demolition surprises are hidden: asbestos in old linings, vinyl and soffits, contaminated soil, buried tanks or old foundations below the slab. A survey and a careful read of the drawings reduce the risk, but contingencies are still sensible.

Disposal is the other underestimated item. Volumes increase once materials are broken up, and mixed waste costs more to dispose of than sorted waste. We estimate loose volumes so your skip and truck counts are realistic.

FAQ

Demolition Estimating questions

Can you estimate demolition without drawings?

Yes, from photos, a measured survey or a site sketch with dimensions. The estimate will state the assumptions made.

Do you price asbestos removal?

We can measure areas from an asbestos survey. Without a survey, we include a provisional allowance and recommend one is carried out.

Do you separate recyclable materials?

Yes. Steel, concrete and clean timber are reported separately so you can price recycling instead of landfill.

Do you estimate soft strips?

Yes. Soft strips of linings, ceilings, services and finishes are a common request ahead of refurbishment.

Can you include temporary propping for partial demolition?

We can include allowances. The propping design itself is by an engineer.

Related services

  • Earthwork Estimating

    Cut and fill volumes, topsoil strip and engineered fill quantities, calculated from your existing and design levels.

  • Excavation Estimating

    Detailed excavation quantities for footings, basements, trenches and pits, with backfill, disposal and support measured separately.

  • Construction Estimating

    A complete, trade-by-trade cost estimate built from your drawings, so you can price, tender or test feasibility with confidence.

  • Commercial Estimating

    Measured estimates for offices, retail, fit-outs and mixed-use buildings, packaged by trade so you can tender subcontractors cleanly.

Get a quote

Send your plans for a demolition estimate

Upload your drawings and we will reply with a fixed fee and turnaround before any work starts. No obligation.

  • — PDF, DWG and ZIP accepted
  • — Fees in NZD, excluding GST
  • — Prefer email? Use the link in the footer

We reply with a fixed fee and turnaround before starting.

Get a QuoteEmail Us