Skip to content
Professional Estimating LLC

Envelope & Interiors

Roofing Estimating Services in New Zealand

True roof areas calculated by pitch, with sheet lengths, flashings, gutters, downpipes and underlay measured for ordering.

Get a QuoteView a SampleTypical turnaround: 1–3 business days

A roof plan is drawn flat, but a roof is not. Measuring a pitched roof from the plan area alone understates the real surface, and the error grows with pitch. Hips, valleys, penetrations and changes in pitch all add flashings and cutting that a plan-area rate will not capture.

We calculate true roof areas from the pitch of each roof plane, then measure every ridge, hip, valley, barge, apron and parapet in lineal metres. For long-run metal, we calculate sheet lengths per run so you can order cut-to-length. For tiles, we count tiles and ridge caps. For membranes, we measure areas, upstands and outlets.

Rainwater goods are included as well: gutters, downpipes, spreaders, outlets and rainheads, so the whole roof package is in one estimate.

Scope

What we measure in a roofing takeoff

ItemUnitWhat it covers
Roof area by planem²True area calculated from pitch.
Long-run sheet scheduleno. × lengthSheet counts and cut lengths per run.
Tiles and ridgesno. / lmConcrete, clay or pressed metal tiles with fittings.
Membrane roofingm² / lmMembrane area, substrate, upstands and outlets.
FlashingslmRidge, hip, valley, barge, apron and parapet.
Underlay and battensm² / lmRoof underlay, safety mesh and battens or purlins.
Gutters and downpipeslm / no.Spouting, downpipes, outlets and brackets.
Penetrationsno.Skylights, flues and vent flashings.

Deliverables

What you receive

Roofing takeoffs include a roof plan marked with each plane's pitch and area, so you can check the true area calculation yourself.

Itemised quantity sheetExcel + PDF
Marked-up plansColour-coded PDF
Material and labour scheduleExcel
Assumptions and exclusions listPDF

Who it is for

Built for the people who price the work

Builders
Get roofing quantities for a complex hipped roof without climbing a ladder.
Subcontractors
Roofers can order cut-to-length sheets directly from the schedule.
Developers
Compare a long-run metal roof against tiles across a development.
Architects
See the cost effect of adding gables, valleys or a lower pitch.

Process

How a roofing estimate runs

  1. STEP 01

    Upload plans

    Upload the roof plan, elevations, sections and roofing specification.

  2. STEP 02

    Scope confirmation

    We confirm roofing profile, underlay, flashing specification and rainwater goods.

  3. STEP 03

    Takeoff and review

    True areas are calculated per plane, then flashings and sheet runs measured and checked.

  4. STEP 04

    Delivery

    You receive the roofing schedule, sheet list, PDF and marked-up roof plan.

New Zealand context

Standards and practice

Metal roofing in New Zealand is commonly installed in line with the NZ Metal Roof and Wall Cladding Code of Practice, which covers minimum pitches, fixing patterns and flashing details. Minimum pitch depends on the profile and whether there are end laps, which affects material choice on low-pitched roofs.

E2/AS1 provides acceptable solutions for roof cladding and flashings on low-risk buildings. In very high wind zones or coastal environments, fixing patterns and material grades may change, so we read the wind zone and exposure from the drawings.

We measure and price to the drawings. Design compliance and building consent remain with your designer and building consent authority.

Cost drivers

What drives the cost of roofing work

  • 01

    Roof shape

    Hips, valleys, dormers and penetrations add flashings and cutting. A simple gable roof is far quicker to cover than a complex hipped one of the same area.

  • 02

    Pitch

    Steep roofs need more safety equipment and slower work. Very low pitches limit material choice and may need membranes or special profiles.

  • 03

    Material and finish

    Long-run metal, tiles, membranes and specialist metals vary widely in cost. Coastal exposure can require higher-grade materials.

  • 04

    Height and safety

    Edge protection, scaffolding and fall arrest are required for most roofing work. These items are priced separately but should not be forgotten.

Where roofing estimates go wrong

Roofing is often estimated from plan area, which understates the real roof area. On steeper roofs, the difference is significant. We always calculate true areas from pitch.

Flashings are the other common gap. Every ridge, hip, valley, barge and apron needs a flashing, and complex roofs have many of them. We measure flashings by type so nothing is left out.

Penetrations for flues and skylights are also commonly missed. Each one needs flashing and sealing. Solar panel mounting points, which need extra flashing and sealing, are now a common addition too.

FAQ

Roofing Estimating questions

Do you calculate true roof area?

Yes. We calculate the true area of each roof plane from its pitch, not the plan area.

Can you give me cut lengths for long-run roofing?

Yes. We schedule sheets by run with cut lengths, ready for ordering.

Do you include flashings?

Yes. Every ridge, hip, valley, barge and apron is measured in lineal metres.

Can you estimate membrane roofs?

Yes. We measure membrane area, substrate, upstands, outlets and overflows.

Do you include gutters and downpipes?

Yes. Rainwater goods are measured with the roof.

Can you estimate re-roofing?

Yes. We measure removal of the existing roof and new roofing, noting assumptions about the existing structure.

Related services

  • Insulation Estimating

    Insulation areas by element and R-value, converted into packs and products, measured to the H1 specification on your drawings.

  • Waterproofing Estimating

    Membrane and tanking quantities for wet areas, decks, basements and roofs, with upstands, outlets and junction details counted.

  • Framing Estimating

    Stud-by-stud framing quantities for walls, floors and roofs, with lintels, bracing elements and fixings taken from your NZS 3604 or engineered drawings.

  • Residential Estimating

    Estimates for new homes, townhouses, alterations and additions, measured from your consent drawings and laid out the way builders price.

Get a quote

Send your plans for a roofing estimate

Upload your drawings and we will reply with a fixed fee and turnaround before any work starts. No obligation.

  • — PDF, DWG and ZIP accepted
  • — Fees in NZD, excluding GST
  • — Prefer email? Use the link in the footer

We reply with a fixed fee and turnaround before starting.

Get a QuoteEmail Us